PPLUS Water Conservation Project: Building Check Dams

PPLUS Visions staff building a check dam in a forest stream

A project inspired by the royal initiative of His Majesty King Rama IX.

On 2 November 2018, PPLUS Visions Co., Ltd. took part in promoting and conserving nature by organising the “Building Check Dams” water conservation project. The check dams retain water and sediment; the stored water seeps into the ground, keeping the forest moist so that trees have water all year round, and also serves as a firebreak against forest fires.

PPLUS Water Conservation Project: Building Check Dams

Pannaree K.

Recognising the importance of developing and restoring forests, His Majesty King Rama IX recommended weirs or check dams as one way to bring moisture back to conserve and restore headwater forests and streams, renew their fertility, foster biodiversity among plant and animal communities, and bring moisture back to the land.

Check dams, also known as “Fai Maew”, are a royally initiated project based on traditional local engineering. A Fai Maew is a semi-permanent check dam, similar to a “Fai Khok Mu”, built from readily available local materials such as branches and rocks to slow the flow of water in streams or small waterways, holding it in place long enough for the surrounding area to absorb it. This restores degraded forest land with enough moisture for it to grow back into healthy forest. Check dams can also raise the water level high enough to divert water into irrigation canals during the dry season. The approach was trialled at the Huai Hong Khrai Royal Development Study Centre in Chiang Mai, where its success made it a model for many later projects.

  • Photo 2 from this event
  • Photo 3 from this event
Back to Activities & Events